Holidays over, back at work - I've had some time to make some progress over the last couple of weekends.
Last weekend, I got the trunking that houses both the daggerboard and mast wells assembled:
(there are 19 separate components in this assembly - I used nearly that many clamps)
This is the key assembly of the whole frame and includes the bow
stringer. Assembly was a three stage process needing patience as I
waited for the epoxy to go off before being able to move on to the next
stage.
Here's the result:
This weekend, I moved on to bulkheads A and B.
Bulkhead A is in 2 parts:
and needed some careful dry assembly and pre-setting of supporting cleats to ensure that the alignment was correct:
I then moved on to bulkhead B, which is the main load bearing cross-boat
structure in the boat and forms the forward wall of the cockpit/well:
So that's the forward half of the frame complete.
No comments:
Post a Comment